Scorecard Administration
A Scorecard metric view contains the saved results from an external operation such as a Monitor Test. If authorized, you can create Scorecard views for one or more Metrics. A Scorecard view can contain up to four (4) separate Metrics, with each Metric configured with different chart settings.
To create a Scorecard view:
- From the Reveille Web interface, click Administration > Scorecards on Left Navigation Pane. The Scorecard Administration page displays.
The Scorecard Administration page includes the following:
- View Name. Name of the scorecard view
- View Description. Description of the scorecard view
- Last Update. Date and time of last update to the scorecard view
- Add New View. Click to create a new scorecard view
When defining a new view, you can select up to four individual Metrics to display.
- For each view, enter the:
- View Name. Name of the scorecard view
- View Description. Description of the scorecard view
- Then select:
- The Metric to display
- The default chart type for the Metric
- The default number of days and the start and end time for a day
- The minimum and maximum values for the y-axis of the chart
- The cost associated with the Metric (optional, available if cost defined to the Metric)
- An attribute name (optional) and attribute value (optional)
- Repeat the previous selection as required to assign for up to four Metric charts on one scorecard view.
- If required, assign security to the Metrics using the Permission Manager (hyperlink) to assign security to the ‘web access to view a metric’ permission.
Was this helpful?
Please tell us why:
Thank you.